Culture
"To carry out three to rectify and improve the level of management" activities - Work Presentation (three)
Date:2011/9/5   Hits:1493
According to the company "to carry out three to rectify and improve the management level," the requirements of the second phase of activities , each unit , the department continues to identify problems, to carry out rectification work . Lan Po into a new materials company on September 2 meeting , according to the company Aug. 19 meeting requirements of the " three rectification " of the deployment : new materials companies outside the network is turned off, then called for the strengthening network management and maintenance ; require departments , branch respectively September 5 - September 9, 2009, September 5 - September 16 to complete supporting documentation and quality department records sort of work ; further strengthen the on-site health management , requiring hardware improvement, management, follow-up , completed in September 16 to perform part of the hardware facilities and repair work ; carding equipment , spare parts , labor office supplies procurement, storage , requisitioned program , budget and final accounts with the finance department to do the work To prevent capital omissions . Haoyuan Company polyester coating workshop and workshop under the Companies ' three rectify "requirement , combined with the actual situation in plants to develop a branch of the three consolidation implementation plan that will identify the problems through to the branch of the daily management , so that long-term, and in accordance with embodiments of track inspection and periodic summary: resolved before the end of September, polyester dress shop employees are not standardized , on-site sanitation, spare parts warehouse stacking and requisitioned goods procedures , employee discipline and other issues ; September 10 formulated coating daily office management system , requiring office desktop neatly, site clean , formulate duty table , and conversation is not rude , lights, appliances meet the requirements ; September 5 specification into the coating workshop personnel processes, including access permissions , dress code , etc. ; 5 September formulated coating plant managers and team DingGang allocation plan ; September 17th overall on-site workshop to implement environmental management requirements, including outdoor hygiene, dressing room , garbage, waste pile , etc. ; September the 10th to develop production records audit inspection process , the person responsible for recording the collation and collection, production records norms into the assessment team ; September 24 to complete the coating plant costing work ; October 1 complete coating equipment maintenance ledger , standard equipment sanitation , spare parts requisitioned and other systems. Industrial Company film plant for the " three rectification " campaign for problem finding, presented the corresponding solution: Sept. complete equipment inspection , maintenance, lubrication management system, standardize the format of related records , and strictly enforced ; norms existing process units account format ; clear cell health lump sum area and responsible person , for machine repair , restaurant, toilets and recycling peripheral regional health difficulties, dead centralized rectification ; repair and replacement on-site hardware conditions to improve the environment of the scene ; setting access control systems, control workshop out of personnel , and the other channel to control and make the mark visible reminder.
Nanjing Lan Po Industrial Co., Ltd.Copyright page 苏ICP备06039122号  Address: Nanjing, Jiangsu Province, central door Maigaoqiao Wanshou Village 94 | Fax:025-85316941| Email:caolpc@yahoo.com.cn
Tel:025-85314823-208/658/205,025-85316941(Marketing Department Contact Cao Min)/025-85314823-102 (Office)